Brad Leonard Builders, Inc.

336-731-3650

Once the interior finishes begin, it is easy to see the finished home taking shape. During this phase, we begin installing interior trim work and cabinets, painting, finishing hardwood floors, installing counter tops and ceramic tile, finishing the plumbing and heating, and installing electrical fixtures. Once these items are complete, we install the appliances and put down the carpet and the only thing left is cleaning which we take care of as well. Once this slideshow is complete click on the Finished Home link at the left and see what the finished product looks like.

  • Painting
    Painting
  • Custom Ceiling Painting
    Custom Ceiling Painting
  • Fireplace and Cabinets
    Fireplace and Cabinets
  • Installing Shower Glass
    Installing Shower Glass
  • Bath Cabinets and Tops
    Bath Cabinets and Tops
  • Kitchen Cabinets and Tops
    Kitchen Cabinets and Tops
  • Ceramic Tile Installation
    Ceramic Tile Installation
  • Hardwood Floor Finishing
    Hardwood Floor Finishing
  • Plumbing Fixtures
    Plumbing Fixtures
  • Carpet
    Carpet
  • Appliances Installed
    Appliances Installed