Brad Leonard Builders, Inc.

336-731-3650

After the preliminary construction is finished, it is time to move inside. During this stage of construction a lot of things begin to happen. First the Plumbing, Heating, and Electrical sub-contractors begin the rough in phase of their work. Once the rough ins are complete, the insulation goes in. During this time the carpentry crews will be putting the finishing touches on their work, installing windows, unfinished hardwood floors, and preparing for the drywall to go up. The next step is drywall which is often done at the same time as some of the outside finish work, which is the next step on our tour.

  • Fireplace Framing
    Fireplace Framing
  • Future Keeping Room
    Future Keeping Room
  • Custom Coffered Ceiling Frame
    Custom Coffered Ceiling Frame
  • Plumbing begins
    Plumbing begins
  • Heating and Air
    Heating and Air
  • Electrical
    Electrical
  • Attic Insulation
    Attic Insulation
  • Wall Insulation, Windows, and Hardwood Floors
    Wall Insulation, Windows, and Hardwood Floors
  • Drywall Begins
    Drywall Begins
  • Drywall and Durock
    Drywall and Durock
Fireplace Framing
Fireplace Framing